Haverford College
OP-2: Building Design and Construction
Status | Score | Responsible Party |
---|---|---|
n/a | 0.00 / |
Bill
Anderko Asst Director Facilities Management: Maintenance Facilities Management |
This credit was marked as Not Applicable for the
following reason:
Institution does not have "Eligible Building Space (Design and Construction)," as defined in this credit.
Haverford College has enacted a buildingpolicy stating tht all new construction will be environmentally friendly.
The most recently completed new construction project at Haverford College was the Douglas B. Gardener Integrated Athlletic Center (GIAC). This 100,000 square foot building was completed in October of 2005 and earned LEED certification at the Gold Level.
In 2009 a 6,000 square foot green roof was installed on a portion of Stokes Hall.
In the fall of 2010 the college began construction site work on two new dormitory buildings. Occupancy is scheduled for the fall of 2012. Each building in 21,252 square feet and each is seeking Gold LEED Certification.
www.haverford.e.du/publications/winter06/mainlines.htm
www.bcj.com/public/projects/project/83.html
www.brucebrooks.com/porjects gardner IAC.html
www.haverford.edu/news/stories/28191/51
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.